SMA base, binder and AC6 wearing course in gray
Taydal were approached by Hawksmoor regarding some work that
needed completing based in Watford. The job entailed groundworks as well as
tarmac installation and involved laying footpaths throughout a residential
estate. The work had to be completed before Christmas, which meant we had to
squeeze it in our schedule before the end of the year.
The work we were asked to carry out involved removals of the
original paving blocks, this was approximately 527 square meters. Following
this, we excavated a trench for the pathways and installed 220 square meters of
PCC edgings to create the footpaths. Before we could proceed with laying
tarmac, we had to ensure the subbase was suitable and lay weed membrane.
The material we laid to create these pathways included 527
square meters of SMA base and binder, this was followed by a mix of AC6 wearing
course in grey and red chips to create a fun effect throughout the footpaths.
The work took our teams 2 days, leaving Hawksmoor and their client extremely
happy with the work carried out.