Case Study

THE FAIRWAYS

location
COLD NORTON
client
madison commercials
Sector
PRIVATE
DATE COMPLETED
24.04.2025

Additional Information

material laid

10mm SMA wearing course

Project Brief

This install was undertaken on behalf of Madison Commercial, whom we have worked with once before during the summer of 2024. They called us in to resurface a long driveway, which lead to a dual garage. The total area of this driveway was 181 square meters and was a challenge for our gang.

Despite the smaller area, this driveway weaved through houses in this compact area, meaning we were unable to travel the lorry down to the driveway to drop the material where needed. Due to this, our gang had quite the task on their hands travelling material to the end of the driveway by multiple wheelbarrows.

The material chosen for this driveway was a simple relay of 10mm SMA wearing course and despite the access issues our gang were faced with, they finished this entire area in a single day. Leaving the area ready for the owners to return to.