Case Study

RAnelagh Road

Location
ipswich, suffolk
Client
capel cs
Completion Date
09.06.2023

Additional Information

material laid

70/10 permeable base course, 40/60 permeable wearing course, AC32, AC20, SMA 100/150

Square meterage

1500 M2

Project Brief

Capel CS are a brand-new customer to Tay-dal, who approached our estimator to quote for some local work, based in Ranelagh Road, Ipswich. The work required was to relay a well-used car park. The car park is based opposite Ipswich train station and is used as an overflow carpark for the train station.

The material we used on this carpark was 70/10 permeable base course and 40/60 permeable wearing course, AC32, AC20, and SMA 10 100/150. This material was used across an area of approximately 1500 square meters. Though not a large area, due to the shape of the car park as well as some restrictions on site time, overall, it took us 5 days to complete. The work also entailed a mix of install style, having to use machines to lay the asphalt on some areas, whereas other areas required hand lay.

As soon as we were completed on site, our friends at GB Roadart were sent in to complete the lining. Laying white car parking spaces alongside yellow crosshatch over the areas that can not be parked in. 

Capel CS are extremely happy with all work carried out. Tay-dal are always happy to establish new professional relationships with new clients and customers.