Project Brief

 

ATB Construction Ltd, based in Orpington, are a large construction and civil engineering specialist. They are a new client to Taydal, but we are slowly building a great working relationship with them. The most recent job they awarded us was for Brixton Station, Nursery Road.

 

Nursery Road is based close to the overhead rail line and required new surfacing to be installed. The area was approximately 135 square meters, the work involved began with laying a geotextile membrane. We then installed a 60mm thick AC20 basecourse over the entire area, followed by a AVG 60mm thick 10mm SMA wearing course.The whole install took a single day, with our team closing off the whole area to ensure efficient installation at top quality.